2.3.1 The ‘manufacturer’ is defined as the body that has signed the contract with LR for
the certification of the rig.
The manufacturer takes responsibility for the rig in all aspects relevant for the
purpose of certification. The manufacturer takes care of timely submission of the
relevant documents and for the solution of any deficiencies that may be encountered.
The manufacturer keeps and maintains the Technical Construction File (TCF).
The Certificate(s) will be under the name of the manufacturer and issued to the
manufacturer.